Required Date: In determining the Required Date, the following need to be considered: What is the status of the equipment or workplace? What is the status of the process schedule? How do the existing or changing conditions influence exposure to hazards and risks? Is there an alternative way of operating that can provide some flexibility in the Required Date? (e.g. guarding/containment, alternate equipment/workplace, alternate time in the schedule or increased future processing rate)? Considering the above, the Required Date is: The date by which an event that will create a safety or environmental threat is probable The date by which a delay in the completion of a scheduled critical path activity is probable. or Not more than an agreed service level period (e.g. 6 weeks) from the date of Work Request creation. Impact: In determining the Impact, the following need to be considered: What potential events could occur? What is the probability over time of an event occurring? What are the potential consequences? Is the threat containable? Is the loss recoverable? Or Not more than an agreed service level period (e.g. 6 weeks) from the date of Work Request creation. Impact: In determining the Impact, the following need to be considered: What potential events could occur? What is the probability over time of an event occurring? What are the potential consequences?
Is the threat containable? Is the loss recoverable? Considering the above, the definitions of Impact are: High –
Significant un-containable safety or environmental threat, or Significant un-recoverable process throughput or quality reduction o Un-containable means that there is no practical way to contain exposure to a threat e.g. use temporary measures such as the installation of barricades, diverting spillage into sumps, drawing from or building stockpiles, subcontracting alternate suppliers for goods or services etc. o Un-recoverable means that there is no alternate equipment, schedule time, operating rate or alternate suppliers etc that will allow catch up to schedule.
Moderate –
Made with FlippingBook - Online Brochure Maker