AAOM Handbook
Sustainability (the following are examples only)
o Process Sustainability = total resources available / rate of consumption of resources. o Asset Condition Integrity = Number of Threats Below Threshold / Total Number of Threats Fleet Life = Actual Life / Target Life 2. Measurements of Theory Parameters resulting from Strategy shall be reported to the following definitions; Use of Time Single Line process o Utilisation = Operating Time / Calendar Time NB A Single Line process is one that has only one entry and exit point for a single product (or a single entry and exit point for each separate product). If a process has a single entry and exit point but has some parallel activities within the process, it is still a Single Line process. Parallel Line process o Utilisation = Sum of Operating Time for each ‘Line’ / (Sum of number of installed Lines * Calendar Time) NB A Parallel Line process is one that has multiple, paired entry and exit points (i.e. completely separate and parallel process lines) for a single product – e.g. a fleet of mobile equipment. If a process has a single entry and exit point but has some parallel activities within the process, it is still a Single Line process. Rate = Units of Product / Unit of Time Quality = Units of On-spec Product / Total Units of Product Reliability
o Time Between Interruptions = Operating Time / Number of Unscheduled Interruptions o Time Between Incidents = Operating Time / Number of Unscheduled Interventions
2. Measurements of technical theory shall be made based on the definition of the theory. There are no common standards for measures of theory.
Made with FlippingBook - Online Brochure Maker