AAOM Handbook

• evaluation of trigger points shall not occur until after the scheduling commencement date (i.e. Activities will not be scheduled before this date), • the triggering of each calendar and usage based Activity shall recognise the trigger parameter start value when determining the first occurrence of the Activity in the schedule, • evaluation of trigger points shall not occur after the scheduling termination date (i.e. Activities will not be scheduled after this date), • a Gantt chart view of the work packages forecast shall be produced, • a run chart forecast mean output of the process for each minimum time scale unit shall be produced, • a capability histogram of the forecast process output for each reporting interval shall be produced, • a run chart forecast of the mean demand for Resource Types for each minimum time scale unit shall be produced, • a capability histogram of the forecast demand for Resource Types for each reporting interval shall be produced.

Time

At each forecasting cycle.

Resources

This task is the accountability of the role identified in the configured flowchart.

© McAlear Management Consultants 2006

Operational Planning: Set Operating Master Schedule

Updated: August 2018

Page 16

Made with FlippingBook - Online Brochure Maker