AAOM Handbook
Appendix 1 – Integrity Critical Item Checklist
Structural Piles Footings/Foundations Slabs (floor, wall & roof) Columns/Beams/Braces/Connection Plates Platforms/Walkways
Stairs/Ladders Rafters/Purlins Sheeting/Cladding (roofs & walls) Brickwork Services ducts (buried) Pipe & cable racks Bridges
Storage/Containment Tanks/ Bins/Hoppers/ Vessels (including thickeners, washers, clarifiers, float cells, etc.) Dams (water, tailings, etc.)/Ponds Dykes/Bunds Sumps Berms/Containment barriers
Electrical Distribution transformers Transmission lines/ Cables/ Poles Lightning Protection Filters (including harmonic) Ground systems Switchboards/Switchgear/Circuit Breakers UPS/Control/Alarm Systems (including process & fire) Rectifiers/Drive systems Motors/Generators Communications systems
Materials Transfer Piping/Troughs//Chutes/Conveyors (bucket, chain, belt, plate, etc.) Spillways/Sluice gates/Channels (including creeks) Drains/Sewers/Siphons
Ducting/Flues/Chimneys/Vents Locomotives/Rails/Rail Beds Roads/Bridges/Cuttings/Tunnels
Mining Ramps/Drives/Rises/Ore Passes/Service Bays Shafts/Hoists/ Headframes/Ropes/ Cages Shovels
© McAlear Management Consultants 2006
Operational Planning: Set Service Strategy
Updated: August 2018
Page 25