AAOM Handbook
Appendix 3
© McAlear Management Consultants 2004
Mill Parameters Planned Maint Time
Min
Most Likely
Max Weighting
Mean
Total Time
24
0
0.5
12
40
0.8
Unplanned Maint Time Ops Setup Time
Planned Maint Time
0
1.5
24
15
2.7
Total Maint Downtime
2.1
Available Time
Unplanned Maint Time
3.3
20.7
Ops Idle Time
0
2.5
5
15
2.5
1.2
3.5
20.5
Rate Maint Capability Losses (%)
0
750
950
8
694.6
Ops Setup Time
Ops Capability Losses (%)
Total Ops Downtime
0
Opertating Time
No. Maint Stops
1.7
19.1
Ops Idle Time
20.5
1.7
No. Ops Stops
Average Stop/Start Loss (%)
Max Potential Throughput
Rate
12328
646.6543566
Grade
1.3
2.1
3.5
10
2.2
Maint Capability Losses (%)
14231
Recovery
70.0% 87.0% 92.0%
10
86%
Maint Quality Losses (%) Ops Quality Losses (%)
Total Capability Losses (%)
Practical Potential Throughput
Ops Capability Losses (%)
0.0%
12328
14231
No. Maint Stops
Actual Throughput
Total No. Stops
Stop/Start Losses
0
0
12328
No. Ops Stops
Average Stop/Start Loss (%)
Total Product (ozes)
Grade (gms/tonne)
730
2.0
Yield (gm/tonne)
1.8
Recovery (%)
90.0%
Prime Product
Maint Quality Losses (%)
730
Total Quality Losses (%)
0.0%
Ops Quality Losses (%)
0.0%
0.0%
Maint… Produ…
Ozes Gold …
Tonnes Mill… Grade
% Reco…
Hrs/D
© McAlear Management Consultants 2006
Operational Planning: Set Performance Targets
Updated: August 2018
Page 13