AAOM Handbook

The trigger (scheduling) parameters for each action shall comprise; • The type of trigger parameter (e.g. prior event, calendar time, operating time, condition/performance parameter), • The trigger value (e.g. following blasting, start of shift, 4 hrs, level less than X tonnes), • The trigger tolerance (e.g. ±1 hr, ±Y tonnes), and

The specification of service actions shall comply with the requirements of TA PL.00 Planning and its subordinate task assignments.

Time

The Production Strategy shall be specified during establishment of a process.

Review and validation of Production Strategy shall be based on either a change of targets driven by changing business expectations or the benefit ranking of improvement opportunities identified through analysis of performance.

Resources

Specification of Production Strategy is the accountability of the role identified in the configured flowchart.

© McAlear Management Consultants 2006

Operational Planning: Set Production Strategy

Updated: August 2018

Page 45

Made with FlippingBook - Online Brochure Maker