o Production strategy implementation quality (control system or work management optimisation) or resourcing quality improvements when the historic performance demonstrates a normal or skewed distribution with lower mode and/or wider spread than required.

o More flexible resourcing levels where a wider distribution spread is required to avoid restricting a design constraint elsewhere in the Value Stream.

o Service strategy specification or implementation quality (work management) or resourcing quality improvements when the historic performance demonstrates a normal or skewed distribution with higher mode and wider spread than required

© McAlear Management Consultants 2006

Operational Planning: Set Production Strategy