In-Situ Mineral Resource
Scheduled Mineral Resource
MINERAL RESOURCE
DESIGN
MINERAL RESERVE
MINE
Stockpile Inputs
Design Ore (RiskPert)
Stockpile Inputs
Min Max Start
min ML max
Min Max Start
0 FGO tonnes
18,035 Total tonnes 32,494 Total tonnes 64,589 Total tonnes
0 FGO tonnes
2,438,700,000 FGO tonnes 1,000,000,000 FGO tonnes
824,150,000 FGO tonnes 450,000,000 FGO tonnes
Figure 5 - Distribution parameter inputs for the Transform and Store processes
2022
2023
2024
2025
2026
24,550 33,506 66,703
25,405 34,300 67,350
27,510 35,220 67,350
27,812 35,535 69,500
26,523 34,665 67,125
Figure 6 – Changing future input parameters to meet Business Expectations
Operational Planning: Building a Business Structure Performance Model Page 11 of 39